Dynamic Risk - Mechanical Integrity

, 6/26/2018 Be the first to comment

Tags: Mechanical Integrity Risk Based Inspection


Things are always changing. Including your risk profile. AOC helps companies manage their dynamic Mechanical Integrity (MI) risk. AOC can help you implement and sustain an effective Risk Based Inspection (RBI) program.

Article

Mechanical Integrity Risk is ever changing. As your equipment moves through its life cycle, deteriorating due to the demands of its operating context and from its exposure to the atmospheric conditions of your facility becoming more susceptible to this deterioration because of operational changes as you try to get more out of the equipment you own, pushing the boundaries of its original design intent. These operational changes are crept in over time without due consideration of the effect on the rate of deterioration or the susceptibility of your assets to new damage mechanisms, leaving your risk assessments out of date and thus your integrity management plan in-effective at monitoring and managing this risk.

  • Does this sound familiar?
  • Does your Risk Based Inspection (RBI) program have a revalidation schedule?
  • Are you re-assessing risk after change triggers?
  • Do you have a robust and effective Management of Change program?

Asset Optimization Consultants (AOC) has many years of experience of both implementing and sustaining effective RBI programs in the Oil, Gas and Chemical industries. We have helped many companies to reinvigorate their mechanical integrity programs and get them back on track to being an effective risk management program for the prevention of loss of primary containment.


Be the first to comment

Comments

There are no comments for this article.

Add your comment

Related Services

Risk Based Inspection (RBI) Implementation and Planning

AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.

Development of Mechanical Integrity (MI) Procedures and Processes

A maintenance system designed in which elements work together as a quality system for maximum returns

RAM, RCM, FMEA, FMECA and Bad Actor Analysis

AOC delivers the policies, procedures, work processes, knowledge and actions such as preventive maintenance, predictive maintenance, and condition monitoring tasks.

Related Tools

API 580 Work Process Quiz

How well do you know RBI? Take this short quiz to test your knowledge of the API 580 risk-based inspection (RBI) work process.

RBI Potential Savings Calculator

Create mechanical integrity (MI) program value rather than it being seen as a necessary cost to minimize.

Related Training

RBI/MI Overview

A high level overview introducing Mechanical Integrity and Risk Based Inspection

API 580 RBI Overview

What impact does Risk Based Inspection (RBI) have on my organization?

API 580 Training

Is your Risk Based Inspection (RBI) program aligned with the API 580 Recommended Practice? Are you ready for certification?

API 581 Overview

What's actually going on inside all of that fancy software? An introduction to the API 581 methodology.

API 581 Training

A deep dive into quantitative Risk Based Inspection (RBI) as outlined in API 581.

Related Knowledge

Risk Strategies for Pressure Retaining Equipment

What are equipment/inspection strategies in relation to mechanical integrity (MI) and risk based inspection (RBI)?

How to Incorporate the New PHMSA Underground Gas Storage Requirements

This is a practical approach to incorporating the new PHMSA gas well rules into your integrity program with the rest of your surface and subsurface assets.

Asset Value Management vs Asset Performance Management

A look at how the financial sector's concept of Asset Value Management can be applied to the petrochemical industry.

RBI Value: Both Transitioning And From The Start

A look at how RBI adds value whether you are just starting out or transitioning from a traditional methodology.

Hidden Benefits of Risk Based Inspection (RBI)

What are the hidden benefits of implementing Risk Based Inspection?

Plant Management 101: Common Work Processes

A dysfunctionality found in many refineries, chemical plants, and other production facilities, is a lack of common asset management work processes.

Proposed API 581 Inspection Plan Optimization Example

An example to compliment our earlier proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

Proposed API 581 Inspection Plan Optimization

A proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

Managing Reliability of Ethane Crackers using DMR, RBI, and IOWs

How RBI, DMR, and IOW programs can be used to manage reliability of Ethane crackers.

Qualitative Risk Assessment of a Commercial Refrigeration System

A case study presenting the methods used to calculate qualitative risk for a critical refrigeration system and the results of the assessment.