by Paul Sheriff, 5/26/2021
Tags: HSE Mechanical Integrity Risk Based Inspection Value
The prime objective of a Site's Mechanical Integrity programme should be to eliminate any unintentional releases of stored energy. Most Sites implement Risk Based Inspection for three obvious reasons. However, as well as these reasons other less obvious but still positive benefits can be achieved through the implementation. These less obvious reasons could be equally valuable to the efficient operation of the Site.