by Vibha Zaman, 10/24/2018
Tags: Risk Based Inspection
Our Senior Corrosion and Mechanical Integrity specialists provide useful insights into the determination of the process information to be used for Risk Based Inspection (RBI) projects. Incorrectly assigning process conditions for a particular piece of equipment can result in overlooking a variety of applicable damage mechanisms and a skewed calculation of risk. Guidance derived from experience is provided to ensure the process conditions are appropriately identified for a number scenarios that have an impact on damage mechanisms and consequence calculations.
This is the first in this eight-part series.