1 entries found for "July, 2024"

  Risk Strategies for Pressure Retaining Equipment

by Michael Hurley, 7/11/2024

Tags: API 580 API 581 Damage Mechanisms Mechanical Integrity Risk Based Inspection

What are equipment/inspection strategies in relation to mechanical integrity (MI) and risk based inspection (RBI)? It is a simple answer, but can be complicated to produce a documented set. API RP 581 has gone as far as the RAGAGEP can go since it is up to the Owner/User to define them as they are responsible for their risk. Knowing strategy/effectiveness tables are likely to be used without modification therefore AOC created a set that can be used as inspection recommendations out of the box.

1 Comments