Key Roles in the Risk Based Inspection (RBI) Team

10/14/2020

This presentation is the second in our new Video Log Series. In this video our Senior Consultant, Paul Raithby will explain the reasons for a Team approach to execute a successful Risk Based Inspection Implementation Project. He will identify the various personnel required to implement a project and their roles in ensuring that the Project is executed efficiently and can be sustained. Come back next month for the next video in our series entitled RBI Project Planning, presented by our VP of Performance and Learning, Leon Johnson.

Subscribe to our YouTube Channel

Video Inquiry

Related Services

Risk Based Inspection (RBI) Implementation and Planning

AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.

Corrosion Control Planning

Achieving zero corrosion-related loss of primary containment in the refining industry.

Damage Mechanism Review / Corrosion Study

One of the most important steps in an RBI project is the corrosion study or damage mechanism review.

Related Tools

API 580 Work Process Quiz

How well do you know RBI? Take this short quiz to test your knowledge of the API 580 risk-based inspection (RBI) work process.

RBI Potential Savings Calculator

Create mechanical integrity (MI) program value rather than it being seen as a necessary cost to minimize.

Related Training

API 580 Training

Is your Risk Based Inspection (RBI) program aligned with the API 580 Recommended Practice? Are you ready for certification?

API 581 Training

A deep dive into quantitative Risk Based Inspection (RBI) as outlined in API 581.

API 580 RBI Overview

What impact does Risk Based Inspection (RBI) have on my organization?

API 581 Overview

What's actually going on inside all of that fancy software? An introduction to the API 581 methodology.

RBI Work Process Using RBMI

How do I use RBMI to perform MI/RBI tasks?

Related Knowledge

Plant Management 101: Common Work Processes

A dysfunctionality found in many refineries, chemical plants, and other production facilities, is a lack of common asset management work processes.

How to Incorporate the New PHMSA Underground Gas Storage Requirements

This is a practical approach to incorporating the new PHMSA gas well rules into your integrity program with the rest of your surface and subsurface assets.

Proposed API 581 Inspection Plan Optimization

A proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

RBI Value: Both Transitioning And From The Start

A look at how RBI adds value whether you are just starting out or transitioning from a traditional methodology.

Risk Strategies for Pressure Retaining Equipment

What are equipment/inspection strategies in relation to mechanical integrity (MI) and risk based inspection (RBI)?

Proposed API 581 Inspection Plan Optimization Example

An example to compliment our earlier proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

Asset Value Management vs Asset Performance Management

A look at how the financial sector's concept of Asset Value Management can be applied to the petrochemical industry.

Insights on Improving Inspection Effectiveness

Since the evaluation of inspection effectiveness for RBI can be so subjective, following these suggestions can greatly improve the process.

Goal: 100% API 580 Certified

A long-standing vision of AOC, we are well on our way to meeting the goal of having 100% of our RBI staff certified to API 580.

Other Benefits of Risk Based Inspection Implementation

A look at several of the secondary benefits of Risk Based Inspection