Value Proposition

Significant value can be obtained from implementing and managing a risk based inspection (RBI) program in your refining, petrochemical or chemical facility. We will show you real examples from owner operators along with empirical results comparing current maintenance costs and risks with the reduced maintenance costs and risk reduction following the implementation of RBI.

Overview

Webinar: developing the value proposition and business case for an rbi program

Bring your pen - you're going to need it - and be prepared to share the following:

  • Lost Profit/Day During Shutdown
  • Analysis Interval (years)
  • Turnaround interval or duration set by inspectors / testing?
  • Number of Pressure Vessels
  • Number of Columns
  • Number of API Tanks
  • Number of Piping Circuits
  • Number of PSVs
  • Average Vessel Internal Inspection Interval
  • Average Vessel External INspection Interval
  • Average API Tank Internal Inspection Interval
  • Average API Tank External Inspection Interval
  • Average PSV Inspection Interval

We will show you how to calculate the following: RBI Value To Plant

Webinar Inquiry

For more information about this course or to inquire about a customized version of this course hosted in-house at our Houston, Texas location or on-site at a location convenient to you, please complete the form below.


Related Services

Reliability Based Asset Management - AIM for all asset families

Asset Integrity Management for all asset families - Rotating, Electrical, Instrumentation, and Fixed Assets

Risk Based Inspection (RBI) Implementation and Planning

AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.

Master Data Management and Data Conversion

Innovative technology that allows quick, efficient extraction of data into a knowledge-centric world

Related Tools

API 580 Work Process Quiz

How well do you know RBI? Take this short quiz to test your knowledge of the API 580 risk-based inspection (RBI) work process.

RBI Potential Savings Calculator

Create mechanical integrity (MI) program value rather than it being seen as a necessary cost to minimize.

Related Training

RBI Concepts - Return on Net Assets (RONA)

Asset Integrity Management - how you perform at the plant level affects those goals set at the board room

Reliability Revolution - Measuring the Value of an RBI Program

How does one of the largest chemical manufacturers measure the value of their RBI program?

Calculating the Value Contribution

How does your AI program meet your RONA goals?

RBI/MI Overview

A high level overview introducing Mechanical Integrity and Risk Based Inspection

API 580 RBI Overview

What impact does Risk Based Inspection (RBI) have on my organization?

Related Knowledge

Hidden Benefits of Risk Based Inspection (RBI)

What are the hidden benefits of implementing Risk Based Inspection?

Plant Management 101: Common Work Processes

A dysfunctionality found in many refineries, chemical plants, and other production facilities, is a lack of common asset management work processes.

Asset Value Management vs Asset Performance Management

A look at how the financial sector's concept of Asset Value Management can be applied to the petrochemical industry.

RBI Value: Both Transitioning And From The Start

A look at how RBI adds value whether you are just starting out or transitioning from a traditional methodology.

How to Incorporate the New PHMSA Underground Gas Storage Requirements

This is a practical approach to incorporating the new PHMSA gas well rules into your integrity program with the rest of your surface and subsurface assets.

Proposed API 581 Inspection Plan Optimization Example

An example to compliment our earlier proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

Proposed API 581 Inspection Plan Optimization

A proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

PHMSA vs OSHA Jurisdiction

PHMSA has out for comment, draft document information, that clarifies its jurisdiction in relation to OSHA for Midstream Processing Facilities.

Other Benefits of Risk Based Inspection Implementation

A look at several of the secondary benefits of Risk Based Inspection

Guidelines for Providing Process Conditions for RBI: Cracking

Additional process data may be needed when environment, stress, and metallurgy are so alligned so as to indicate susceptibility to environmental cracking.